Gehring-Tricot Warehouse Expansion
This project involved the construction of two new high bay additions to an existing and operating textile plant. The total new space under cover totaled 9480 square feet. Additionally, BBC constructed two new loading docks that were phased to permit ongoing trucking operations during construction operations.
Client: Gehring-Tricot Corporation
Address: 68 Ransom Street, Dolgeville, NY
Construction Contract: Construction Manager-GMP (Guaranteed Maximum Price)
About this Project
This project involved the construction of two new high bay additions to an existing and operating textile plant. The total new space under cover totaled 9480 square feet. Additionally, BBC constructed two new loading docks that were phased to permit ongoing trucking operations during construction operations.
Highlights
- Fast-track construction
- Erection of clear span structural roof system
- Installation of insulated metal panel siding
- Installation of a new EPDM roof system
- Application of chemical resistant epoxy floor coating
- Upgraded MEP, sprinkler and fire alarm systems
- Interior floor drainage system including a 2500 gallon liquid recovery holding tank
- Extensive site work and drainage upgrades